Testing Technology Service Ltd.Supporting international sourcing teams

TTS / SERVICE GUIDE

Pre-Production Inspection in China (PPI)

Catch material and preparation issues before they reach the production line.

  • Raw materials
  • Components
  • Readiness
Request a quote
Incoming metal coils before production
Incoming metal coils before productionReport photo ↗

01 / WHEN TO USE IT

Before the line starts

  • You are placing a first order with a factory.
  • Materials or components have changed since sample approval.
  • You want to verify preparation before bulk manufacturing.
Understand the service in detail

Problems in bulk production often start with the wrong material, missing components or an unconfirmed reference sample. A pre-production inspection focuses on what is available before manufacturing begins. TTS reviews the agreed inputs and preparation evidence so you can raise discrepancies before they are built into a full order. This service suits new products, new suppliers, important material changes and orders where colour, finish or component consistency matters.

THE SERVICE AT A GLANCEDEFINE → CHECK → RECORD
  1. 01BOM & approved reference
  2. 02Incoming materials
  3. 03First-piece checks
  4. 04Issues before bulk production

A scope guide; the actual methods and criteria are agreed for the project.

02 / A CLOSER LOOK

Find a material mismatch before it becomes a batch problem.

Open a checkpoint to see the evidence recorded and how it informs your decision.

Furniture parts laid out for an assembly check
Furniture parts laid out for an assembly checkReport photo ↗
01

Material identity

Match supplier references, material batch labels and available certificates to the purchase specification or bill of materials (BOM).

What this means for you

A similar colour or appearance does not establish that the specified resin, fabric or component was supplied.

02

Approved reference

Confirm which sealed sample, drawing revision, colour reference and measurement sheet governs production.

What this means for you

Conflicting sample versions create disputes later. Record the controlling reference and unresolved differences before release.

03

Available quantity

Compare usable material and component quantities with the planned order, including shortages and material awaiting approval.

What this means for you

Production readiness depends on the required component set, not just the presence of the main material.

04

First-piece readiness

Review the initial assembly or first-off sample where available, tooling readiness and the factory’s incoming-quality-control (IQC) records.

What this means for you

Decide which concerns must be resolved before bulk production and which need a targeted during-production check.

ILLUSTRATIVE EXAMPLE

One changed component can affect the entire order.

  1. !

    The situation

    A replacement zipper arrives for production.

  2. ◎

    What to record

    Compare its marking, construction and function with the reference.

  3. ↗

    The next decision

    Resolve approval before the stock is consumed.

Read the full scenario

Illustrative example: the approved sample uses one zipper, while the warehouse contains a visually similar replacement. Record the markings and compare dimensions, function and construction with the approved reference. Ask for buyer approval or the specified component before production consumes the stock. Any laboratory performance requirement remains a separate item in the test plan.

03 / STANDARDS & REQUIREMENTS

The rule.
The scope.
The evidence.

Applicability and editions are confirmed for your product, market and project date.

BOM, technical drawings & approved sample

These product-specific references define the material and construction being verified. Provide revision numbers and agreed tolerances.

Official source & scope
ISO 2859-1

Use an agreed sampling plan when incoming components are checked by sampling; keep it distinct from complete document and readiness checks.

Official source & scope

04 / THE WORKING PROCESS

From your brief
to your next step.

01Prepare the brief

Send the material list, specifications, approved references and intended start date.

02Start the work

Confirm which inputs have arrived and which preparation activities can be inspected.

03Examine & record

Compare the accessible materials and record differences with photographs and quantities.

04Review & follow up

Review the findings with the supplier before deciding whether further checks or corrections are needed.

TTSDELIVERABLE CONTENTS
Pre-production inspection
01Order identity & agreed scope
02Criteria & recorded findings
03Supporting evidence
04Limitations & open points

Content guide; the agreed service determines the final deliverable.

05 / YOUR DELIVERABLE

A basis for
your next decision.

Material findings and preparation gaps to address before production.

How to use the result

The findings help you request replacement material, clarify an instruction or agree the next production checkpoint. Materials that are unavailable during the visit remain outside the observed result; chemical composition or other hidden properties may require laboratory testing.

Report examplesOpen a published TTS sample report (PDF) ↗

06 / Discuss your project

What to send for a quotation

  • Bill of materials and quantities for the order.
  • Approved sample, colour references and component specifications.
  • Factory address, contact, material arrival dates and production schedule.
Request a quote

Practical questions

Can a PPI approve chemical composition?

Visual checks and supplier documents cannot replace a required analytical test. If composition or restricted substances are critical, identify the relevant laboratory testing before approving the material.

Can this verify chemical composition?

Visual checking can verify identification and visible condition. Chemical composition requires an agreed analytical test and suitable samples.