TTS / SERVICE GUIDE
EAC Certification & Declaration Support for Russia and the EAEU
Clarify the assessment route before preparing an application for your product.
Request a quote
01 / WHEN TO USE IT
Russia & the EAEU
- You are planning a first shipment to Russia or another EAEU market.
- A customer asks whether certification or declaration is required.
- A new model, manufacturer or supply arrangement needs review.
Understand the service in detail
A product intended for Russia or another EAEU market needs an assessment of the applicable technical regulations and the appropriate conformity route. EAC support begins with product classification, intended use, shipment or production arrangements and available evidence. TTS helps coordinate a project-specific document checklist and the agreed application steps. Certification and declaration are distinct routes; the correct option cannot be selected from the product name alone. Confirming the route, applicant and required assessment participants early helps avoid preparing documents for the wrong scope.
- 01Identify product scope→
- 02Regulation & scheme→
- 03Testing / application evidence→
- 04Applicable registration route
A scope guide; the actual methods and criteria are agreed for the project.
02 / A CLOSER LOOK
Select the regulation and scheme before collecting certificates.
Open a checkpoint to see the evidence recorded and how it informs your decision.

01Classification and intended use
Describe the product, function, technical characteristics, model variants and destination. Supply available customs-classification information for review.
A trade name or tariff code alone should not be treated as the complete technical-regulation assessment.
02Applicable technical regulations
Identify all relevant TR CU/TR EAEU requirements and whether the product is covered by certification, declaration or another applicable route.
One product may involve more than one regulation. Existing CE evidence does not automatically settle EAEU conformity.
03Applicant and supply scheme
Clarify manufacturer, applicant, batch or serial-production arrangement and the authorised assessment participants needed.
The scheme influences the evidence and possible assessment steps; it should be agreed before sample dispatch or application preparation.
04Technical and application records
Align model identifiers, technical specifications, manuals, labels, test evidence and the agreed application information.
Differences between the marketed product and the submitted documents can require correction or additional evidence.
ILLUSTRATIVE EXAMPLE
A model family contains materially different configurations.
- !
The situation
Models in one application have different characteristics.
- ◎
What to record
Compare model identity, electrical parameters and construction.
- ↗
The next decision
Confirm the evidence and scope for each covered variant.
Read the full scenario
Illustrative example: an exporter groups several machines under one commercial series, but their functions and electrical configurations differ. Prepare a model comparison and identify the technical differences before determining document coverage. A shared series name does not establish that one test report or conformity document covers every configuration.
03 / STANDARDS & REQUIREMENTS
The rule.
The scope.
The evidence.
Applicability and editions are confirmed for your product, market and project date.
TR CU 004/2011 / TR CU 020/2011
Examples concern low-voltage equipment safety and electromagnetic compatibility. Confirm product coverage and the applicable conformity route.
Official source & scopeTR EAEU 037/2016
Restricted-substance requirements for covered electrical and radio-electronic products; assess scope separately from other electrical requirements.
Official source & scopeTR CU 010/2011
A machinery and equipment safety regulation to review when the actual product falls within its scope.
Official source & scope04 / THE WORKING PROCESS
From your brief
to your next step.
01Prepare the brief
Share the product and destination details, proposed supply arrangement and available documents.
02Start the work
Confirm the route, applicant requirements, assessment participants and document checklist.
03Examine & record
Prepare and review the agreed technical information, samples and application materials.
04Review & follow up
Coordinate the agreed submission steps and record outstanding questions or conditions.
Content guide; the agreed service determines the final deliverable.
05 / YOUR DELIVERABLE
A basis for
your next decision.
A project-specific route and document checklist, with coordination of the agreed application steps.
How to use the result
The output clarifies the agreed route, evidence requirements and coordination steps. Final assessment and registration responsibilities depend on the applicable scheme and authorised participants; support is not a guarantee of approval.
06 / Discuss your project
What to send for a quotation
- Product models, technical description, intended use and destination country.
- Manufacturer and proposed applicant details, shipment or series-production information.
- Drawings, specifications, manuals and available test or conformity documents.
Practical questions
What is the difference between an EAC certificate and a declaration?
They are different conformity routes with different responsibilities and evidence arrangements. The applicable technical regulation and scheme determine which is required.
Can I use the same dossier prepared for CE marking?
Relevant technical information can be reviewed and reused where accepted, but the EAEU route, applicant, language and evidence requirements must be assessed separately.
Can a CE report automatically replace EAC assessment?
No. Existing evidence may be reviewed, but the applicable EAEU requirements and the confirmed assessment route determine what can be used and what is still required.